Flagpole sales and installation in Concord — we supply the pole and we put it up, sized for the local wind and fitted by experienced, licensed and insured crews.
Nothing there yet. We size it, dig the base, set the pole and fly the flag. One price for all of it.
Get a priceBent, snapped or corroded. Often we reuse the concrete that is already there, which makes it a short visit.
Get a priceFrayed rope, a seized pulley, a worn winch. Small jobs we still turn up for.
Get a priceThe State House grounds and the state office buildings around them carry 30 to 40 ft; those lawns are wide and anything shorter is swallowed by them. The hospital, NHTI and the school grounds settle at 30 ft. Main Street and Eagle Square want 25 ft. Out on Loudon Road the retail sits back behind its car parks, and nothing under 35 ft registers from the road.
The state capital, and most of what stands in it belongs to the state: the State House and the agency buildings around it, with a hospital, a technical college and a commercial strip east of the river on Concord Heights. We cover Concord and the Merrimack County area, including the State House and the gold dome above it, Main Street and Eagle Square, the Merrimack River, Concord Hospital, NHTI, St. Paul's School, the granite quarries on Rattlesnake Hill at the north end of the city and the Loudon Road corridor on Concord Heights.
Wind here. Concord sits in an inland, low-lying and sheltered area, which works out to roughly 110 mph under the code your town uses. That figure decides how wide and how thick the pole has to be, so we check it against your address before we quote. Concord carries the gentlest figure on this page, so on most sites the pole is the easy half of the job and the ground is not. The granite that built the State House, and the granite that built the first Library of Congress building, came off Rattlesnake Hill at the north end of town, and the same rock sits close to the surface across a good deal of the city: an auger can refuse well above the depth the frost line needs, and the last of the hole then has to be drilled and split. That is worth establishing before a foundation price is written down. Downtown work also passes the planning board's design review committee, whose comments tend to arrive as conditions on the approval. Main Street was rebuilt ten years ago with wider walkways and new planting, so a pole on that stretch is placed to keep the flag clear of the young trees as well as of the awnings.
Most of the people who call us from Concord are state agency and county buildings, city facilities, the hospital and medical offices, schools, churches, veterans posts and Main Street businesses.
Tell us roughly what you need. One person reads it and replies with a real number, usually the same day.
All of this goes in your message. You can change anything below, or just add a note.
Your request is in. Someone will come back with a real number, usually the same business day. If it is urgent, call or text (667) 231-9065.