Flagpole sales and installation in Montpelier — we supply the pole and we put it up, sized for the local wind and fitted by experienced, licensed and insured crews.
Nothing there yet. We size it, dig the base, set the pole and fly the flag. One price for all of it.
Get a priceBent, snapped or corroded. Often we reuse the concrete that is already there, which makes it a short visit.
Get a priceFrayed rope, a seized pulley, a worn winch. Small jobs we still turn up for.
Get a priceThe state offices and the schools settle at 30 ft. State Street and Main Street sit at 25, which is about as much as a shopfront block that narrow will carry. On the Capitol Complex the working range is 30 to 35 ft, and anything above that is a question for the state before it is a purchase, because nothing up there is meant to argue with the dome.
The least populous state capital in the country, and a working one: the State House, the state offices around it and a long-standing insurance trade, in a town of about eight thousand. We cover Montpelier and the Washington County area, including the State House and the state office buildings around it, State Street and Main Street, Hubbard Park and the hillsides above the city, the National Life campus on the hill west of downtown, the Winooski River and North Branch frontage, and Barre, Berlin and Northfield nearby.
Wind here. Montpelier sits in a sheltered, deep-valley area, which works out to roughly 105 mph under the code your town uses. That figure decides how wide and how thick the pole has to be, so we check it against your address before we quote. Montpelier looks hard at the appearance of things, and its rules say why. Downtown, Stone Cutter's Way and the National Life property all sit inside the city's design control district, and the gateway views of the State House are one of the things that district exists to protect. Height is therefore the first question about a pole here rather than the last. The Design Review Committee sees the application and recommends; the Development Review Board decides. The Capitol Complex itself is written out of that district and is the state's own ground, so a pole on the State House lawn is a different conversation from a pole on State Street. The other Montpelier constraint is water. Downtown is where the North Branch meets the Winooski, the July 2023 flood went straight through it, and a low site there picks up flood hazard rules on top of the design ones, which can settle where the pole goes as firmly as the sightline does.
Most of the people who call us from Montpelier are state agencies and the buildings they occupy, city facilities, insurance and professional offices, schools, churches, historic-district businesses and veterans posts.
Tell us roughly what you need. One person reads it and replies with a real number, usually the same day.
All of this goes in your message. You can change anything below, or just add a note.
Your request is in. Someone will come back with a real number, usually the same business day. If it is urgent, call or text (667) 231-9065.